Timedora
Free Online Flashcard Deck

Field Records and Data Quality Free Online Flashcards

Study Field Records and Data Quality with 12 free online flashcards. Review key terms, definitions, and concepts with this interactive flashcard deck.

12 cards
01
Front

Which identifying details belong in field notes?

Back

Identify the project, site, date and time (including time zone), observers, and visit number, as applicable.

02
Front

How do quality assurance and quality control differ?

Back

Quality assurance establishes procedures for obtaining reliable data; quality control consists of checks that detect problems in particular observations or records.

03
Front

What makes field records easy to locate later?

Back

Use consistent identifiers to link files, a predictable folder structure, clear filenames with dates and site IDs, and an index describing contents and versions.

04
Front

What should a field sketch communicate?

Back

A sketch should show key site features and relationships among measurement points, with labels and reference points. State whether it is to scale; if not, label it “not to scale.”

05
Front

How should an error in a field record be corrected?

Back

Preserve the original record and make each correction traceable under project procedures. Record failed checks, corrective actions, and unresolved limitations.

06
Front

Where should a measurement’s quality information be recorded?

Back

Keep calibration or check results, repeat readings, uncertainty or estimated status, instrument problems, and procedure deviations associated with the individual measurement.

07
Front

How should repeat readings be evaluated?

Back

Compare them with the project’s acceptance criteria. Investigate differences rather than silently choosing one value.

08
Front

What information makes repeated readings checkable in a measurement log?

Back

Include the point or ID, time, measurement, units, method or instrument, reference or datum, and any check or comment.

09
Front

What should you do with an unexpected outlier?

Back

Do not conceal it just because it looks unexpected. Record failed checks, corrective actions, and unresolved limitations.

10
Front

How should original field records relate to processed datasets?

Back

Keep original field records separate from processed or corrected datasets, using access and backup practices appropriate to the project.

11
Front

How can a second-person review improve data entry?

Back

A second-person review can catch omissions and transcription mistakes that the person who collected the data may overlook.

12
Front

Why should field logs avoid unsupported precision?

Back

Follow the project’s required precision and recording conventions; do not imply more precision than the instrument or method supports.