Free Online Flashcard Deck

3 Capacity Planning Free Online FlashCards

Study 3 Capacity Planning with 12 free online flashcards. Review key terms, definitions, and concepts with this interactive flashcard deck.

12 cards
01
Front

What is capacity planning?

Back

Capacity planning aligns an organization’s resources with expected demand, balancing service needs against the costs and risks of too much or too little capacity.

02
Front

How should an operation’s capacity be measured?

Back

Choose units that reflect the operation, such as customers served per hour, beds available, labor hours, or products per shift.

03
Front

What is design capacity?

Back

Design capacity is the maximum theoretical output under specified conditions.

04
Front

How is capacity utilization calculated?

Back

Utilization compares actual output with design capacity: Utilization=Actual outputDesign capacity×100%\text{Utilization} = \frac{\text{Actual output}}{\text{Design capacity}} \times 100\%.

05
Front

What is a capacity constraint?

Back

A constraint is any resource or condition that limits an operation’s output, such as machine time, staffing, workspace, materials, or policy.

06
Front

Steps handle 50, 30, and 40 orders per hour. What is the process capacity?

Back

The process can handle at most 3030 orders per hour, because every order must pass through the step with capacity 3030 orders per hour.

07
Front

What happens if capacity is increased at a non-bottleneck step?

Back

Speeding up a non-bottleneck step does not raise total process capacity; it may instead create queues and excess work in process.

08
Front

Name ways to respond when expected demand exceeds capacity.

Back

If expected demand exceeds capacity, options include overtime, extra shifts, cross-training, process improvements, subcontracting, or investment in equipment and facilities.

09
Front

What is a leading capacity strategy?

Back

Leading capacity adds resources before demand is expected to rise. It can protect service and support growth, but risks idle resources if the forecast is too high.

10
Front

What are the main steps in a capacity planning process?

Back

Forecast demand, check effective capacity, identify gaps and constraints, compare alternatives and their effects, then monitor demand and output to adjust the plan. Account for demand uncertainty.

11
Front

What is effective capacity?

Back

Effective capacity is the output realistically achievable after accounting for operating limits such as maintenance, product mix, breaks, and setup time.

12
Front

How is capacity efficiency calculated?

Back

Efficiency compares actual output with effective capacity: Efficiency=Actual outputEffective capacity×100%\text{Efficiency} = \frac{\text{Actual output}}{\text{Effective capacity}} \times 100\%.