Timedora
Free Practice Quiz Question List

4 Evacuation and Dehydration Procedures Online Quiz Questions

Use this free practice quiz with 20 questions to review 4 Evacuation and Dehydration Procedures, test your knowledge, and prepare for your next test or exam.

20 questions
01
True or false
1 point

True or false: A chiller’s compressor may be used to evacuate its refrigeration system.

  1. A

    True

  2. B

    False

02
Choose one
1 point

A chiller vessel contains standing water before evacuation. What should the technician do?

  1. A

    Continue evacuation until the vacuum pump removes all standing water.

  2. B

    Remove standing water using the manufacturer’s procedure before evacuation.

  3. C

    Use the compressor to move standing water out of the vessels.

  4. D

    Pressure-test the circuit with compressed air to clear the water.

03
Fill in the blank
1 point

To measure the chiller’s actual vacuum as accurately as practical, place the micron gauge .

04
Choose one
1 point

Which sequence follows the recommended order for leak checking and dehydration?

  1. A

    Evacuate first, then pressure-test only if the vacuum will not hold.

  2. B

    Begin deep dehydration before checking for leaks to save time.

  3. C

    Pressure-test for leaks, repair any leaks, and then begin evacuation.

  4. D

    Charge the system before pressure-testing it.

05
Written response
1 point

For a U.S. stationary appliance containing more than five pounds of refrigerant, what recovery evacuation level does EPA Section 608 list for a low-pressure appliance? Enter the numeric value; the answer will be displayed in mm Hg absolute.

06
Choose all
1 point

Which precautions apply when using nitrogen during service? Select all that apply.

  1. A

    Use dry nitrogen with a regulator.

  2. B

    Use oxygen if it is supplied at a low pressure.

  3. C

    Stay within the manufacturer’s pressure limits.

  4. D

    Ventilate the work area to prevent nitrogen from displacing breathable air.

  5. E

    Use compressed air instead of nitrogen when nitrogen is unavailable.

07
Choose one
1 point

A technician is preparing to set a chiller’s final vacuum target and standing-hold criteria. Which approach is appropriate?

  1. A

    Use the same final vacuum target and hold time for every chiller.

  2. B

    Follow the model-specific procedure rather than treating an example target as universal.

  3. C

    Use the recovery evacuation level as the deep-dehydration target.

  4. D

    Set the final target based on the pump-side gauge reading.

08
Fill in the blank
1 point

Before starting a vacuum-decay hold test, so the chiller is isolated from the pump.

09
Written response
1 point

What is the name of the test in which the system is isolated from the pump and its pressure rise is monitored during a hold period?

10
True or false
1 point

True or false: During a vacuum-decay test, a pressure rise that tends toward atmospheric pressure suggests a leak, but does not by itself prove the cause.

  1. A

    True

  2. B

    False

11
Choose all
1 point

Which checks support verifying both dryness and leak tightness before charging? Select all that apply.

  1. A

    Confirm that the system reaches and holds the manufacturer’s final vacuum target.

  2. B

    Treat a low micron reading at the pump while it is running as proof of dryness.

  3. C

    Confirm that the required pressure leak test is passed.

  4. D

    Use the recovery evacuation level as the only dryness criterion.

  5. E

    Check that the system meets the specified vacuum-hold criteria.

12
Open ended
1 point

Describe how a technician should proceed from leak checking through evacuation and vacuum-hold verification before charging a chiller. Explain why the recovery evacuation level is not the deep-dehydration target and why a pressure rise during an isolated hold test must be interpreted cautiously.

13
Choose one
1 point

During evacuation, moisture in a chiller cools enough to freeze. What effect can this have?

  1. A

    It eliminates the need to monitor absolute pressure.

  2. B

    It proves the system has a leak.

  3. C

    It can temporarily slow drying and make readings misleading.

  4. D

    It allows the compressor to complete evacuation.

14
True or false
1 point

True or false: If the system temperature changes between vacuum-decay readings, the technician can interpret the pressure trend without accounting for that temperature difference.

  1. A

    True

  2. B

    False

15
Choose one
1 point

Which statement correctly distinguishes evacuation from dehydration in a refrigeration circuit?

  1. A

    Evacuation removes moisture; dehydration removes refrigerant and air.

  2. B

    Evacuation removes refrigerant, air, and other gases; dehydration removes water vapor and moisture.

  3. C

    Evacuation tests for leaks; dehydration recovers refrigerant.

  4. D

    Evacuation and dehydration are two names for the same procedure.

16
Written response
1 point

In the YORK centrifugal chiller example (not a universal requirement), what is the initial evacuation hold-test value? Enter the value in microns.

17
Choose one
1 point

Which instrument and placement are suitable for monitoring deep vacuum in the chiller?

  1. A

    A conventional manifold gauge at the pump

  2. B

    A pressure gauge connected to the nitrogen regulator

  3. C

    A calibrated micron gauge at or near the chiller

  4. D

    A temperature probe at the pump inlet

18
Written response
1 point

Which type of gauge is not accurate enough to verify deep vacuum? Enter the gauge type.

19
Choose one
1 point

A chiller has a suspected leak before dehydration begins. What should the service team do first?

  1. A

    Repair leaks and complete the required pressure leak test before evacuation.

  2. B

    Begin evacuation and use the vacuum-decay test as the only leak check.

  3. C

    Evacuate first, then use the compressor to remove remaining air.

  4. D

    Skip leak testing if a micron gauge is installed at the pump.

20
Choose one
1 point

When beginning a vacuum-decay test, how should the chiller be configured so its pressure trend can be observed?

  1. A

    Leave the pump connected and running so it can hold the vacuum.

  2. B

    Open the circuit to atmosphere and monitor the pump.

  3. C

    Close all service ports before recording any starting reading.

  4. D

    Close the valve between the system and pump, then monitor the isolated system as directed.