Study 5 IT Change Management with 12 free online flashcards. Review key terms, definitions, and concepts with this interactive flashcard deck.

12 cards
01
Front

What is IT change management?

Back

IT change management is the controlled process of modifying technology services, systems, configurations, or related procedures to deliver useful changes while limiting disruption, security exposure, and operational risk.

02
Front

What defines a standard change?

Back

A standard change is routine and low risk, and follows a documented, preapproved procedure. Record and perform each instance according to that procedure.

03
Front

Which factors should a change assessment consider?

Back

Assess the change’s purpose, affected systems and users, dependencies, timing, and potential effects on availability, security, privacy, safety, and compliance.

04
Front

How should review effort relate to change risk?

Back

Estimate the likelihood and impact of failure, identify mitigations, and make the level of review proportionate to the change’s risk and impact.

05
Front

What purpose and scope should a change request state?

Back

A request should state the reason for the change, its intended result, and the systems, services, configurations, and people affected.

06
Front

Who should approve a normal change?

Back

Before implementing a normal change, obtain approval from people authorized by organizational policy. Record the decision and its rationale.

07
Front

What should change communications tell affected stakeholders?

Back

Tell affected people what is changing, why and when, what effects or actions to expect, and where to get help. Give notice early enough to prepare while protecting sensitive operational details.

08
Front

What should be confirmed before implementing a change?

Back

Before implementation, confirm authorization, scope, timing, access, dependencies, backups or saved configurations, and rollback readiness.

09
Front

What should happen when post-change validation fails?

Back

Verify that the change achieved its intended result and that affected services remain secure and operational. If validation fails, follow the rollback plan or escalate through incident procedures.

10
Front

What must be recorded before closing a change?

Back

Close the record only after documenting what and when work was done, who performed and approved it, validation results, unexpected effects, and rollback or follow-up work.

11
Front

What approval does a normal change require?

Back

A normal change requires case-by-case assessment and approval before implementation.

12
Front

How should an emergency change be handled?

Back

An emergency change addresses an active outage, security threat, or similarly time-critical risk. Use the emergency authorization process and complete required documentation and review afterward.