Using the Schedule Baseline for Project Control
Explains how an approved, logically linked schedule baseline supports project control and why it should remain a reliable measure of performance.
The as a Shared Control Tool
A schedule is more than dates
A construction schedule is a working control tool: it connects the sequence of work with the crews, materials, equipment, access, inspections, and decisions needed to carry it out. These links make it useful for coordination as well as timing. Schedule control compares actual performance with an approved , helps forecast the likely finish, and prompts timely action when results diverge from the plan.
Build a shared, connected plan
Begin with an approved schedule that reflects the contract scope, project milestones, and interfaces between trades and organizations. Keep contractor-level detail connected to project-level milestones. That way, field teams and management can use schedules whose expectations are compatible, rather than treating the detailed plan and the broader project dates as unrelated.
For example, in a hypothetical project, a planned sequence might depend on a work area becoming accessible before a crew can proceed, and on an inspection being included in the plan. The schedule’s value is not just naming dates: it makes such coordination needs visible alongside the work sequence.
Measure against the ; assess changes broadly
Compare actual performance with the approved and preserve that reference. Quietly revising it merely to make slippage disappear obscures whether work is diverging from the original plan. When results do diverge, use schedule control to identify the variance, forecast the likely finish, and prompt timely action.
Also assess proposed changes across scope, cost, and time because these affect one another. A change to the planned work should not be considered only as a date adjustment; consider its implications for all three dimensions.
: A schedule that logically links the work rather than listing dates in isolation.