What does project resource planning establish?

Back

Resource planning identifies what resources a project needs, when they are needed, and who will provide or use them, while checking that plans fit realistic availability.

02
Front

How do effort and duration differ?

Back

Effort is the amount of work; duration is the elapsed time to complete it. They are related but not interchangeable.

03
Front

What should be checked when assessing resource availability?

Back

Check commitments, maintenance, leave, delivery lead times, and other constraints. A listed resource may not be available whenever the project needs it.

04
Front

Why might a person listed at full capacity have less project time available?

Back

A person listed at full capacity may still have meetings, operational duties, or other assignments that reduce usable project time.

05
Front

What is a resource breakdown structure?

Back

A resource breakdown structure groups resource needs by category, such as personnel, equipment, materials, and facilities.

06
Front

What does a time-phased resource plan show?

Back

It shows the quantities of resources needed in each period, helping reveal demand peaks and shortages.

07
Front

How does a named assignment differ from a role-based estimate?

Back

A role-based estimate identifies the capability needed; a named assignment identifies a specific person and should be confirmed before it is relied on in a committed schedule.

08
Front

What does a responsibility assignment matrix connect?

Back

A responsibility assignment matrix links project work to the people or roles responsible for it.

09
Front

In RACI, what does the Responsible role do?

Back

The Responsible role performs the work.

10
Front

In RACI, what does the Accountable role own?

Back

The Accountable role owns the result or decision. Normally, each activity should have one clear accountable role.

11
Front

How do Consulted and Informed roles differ in RACI?

Back

Consulted roles provide input before or during the work; Informed roles receive updates.

12
Front

What is resource smoothing?

Back

Resource smoothing moves work within its available schedule flexibility to reduce demand peaks, while keeping the planned completion date unchanged when possible.