True or false
1 point

True or false: A clear project scope helps stakeholders share an understanding of the work and helps the team judge whether proposed work belongs in the project.

  1. A

    True

  2. B

    False

02
Choose one
1 point

A library project aims to let registered members reserve available books online. Which statement specifies a capability the system must provide?

  1. A

    The system shall let a registered member reserve an available book.

  2. B

    Improve library access.

  3. C

    Increase library membership.

  4. D

    Redesign the library’s catalog system.

03
Fill in the blank
1 point

The team defines observable conditions for deciding whether a deliverable is complete. These conditions are called .

04
Choose one
1 point

A team tests whether a completed feature satisfies its documented requirements. Which activity is it performing?

  1. A

    Verification

  2. B

    Validation

  3. C

    Change control

  4. D

    Traceability

05
Written response
1 point

What project-management term means a defined output produced by a project, such as an approved design or working software feature?

06
Choose all
1 point

Which qualities should a well-formed project requirement have? Select all correct answers.

  1. A

    Clear

  2. B

    Necessary

  3. C

    Consistent

  4. D

    Testable

  5. E

    Broad enough to cover any future request

  6. F

    Written without identifiers

07
True or false
1 point

True or false: Once stakeholders approve a project scope baseline, the project must reject every proposed change.

  1. A

    True

  2. B

    False

08
Fill in the blank
1 point

In a scope definition, work and capabilities the team will deliver are described as .

09
Choose one
1 point

A library project will add online reservations but will not redesign the library catalog. What should the scope definition do to make this boundary clear?

  1. A

    Add the catalog redesign to the reservation feature's acceptance criteria.

  2. B

    Leave the catalog redesign unmentioned because it is related work.

  3. C

    Explicitly identify the catalog redesign as out of scope.

  4. D

    Treat the catalog redesign as an interface without clarifying whether it will be delivered.

10
Choose all
1 point

Before approving a requested change, which potential effects should the team assess? Select all correct answers.

  1. A

    Scope

  2. B

    Quality

  3. C

    Cost

  4. D

    Schedule

  5. E

    Risks and related work

  6. F

    Only the requester's preferred completion date

11
Written response
1 point

What is the term for checking whether a project's result meets the user's or customer's intended need?

12
Open ended
1 point

A stakeholder requests a new capability after the project baseline is approved. Describe the main steps the team should follow to evaluate and manage this change through closure.

13
Choose one
1 point

A reservation feature must exchange information with a separate account system owned by another team. Which scope element describes this connection or handoff?

  1. A

    A limit the team must work within

  2. B

    A connection or handoff with another system, team, or organization

  3. C

    A condition treated as true for planning

  4. D

    A criterion used only to decide whether a deliverable is complete

14
Choose one
1 point

A library project team is defining its objectives. Which statement describes an intended result rather than a requirement, deliverable, or constraint?

  1. A

    The system shall let a registered member reserve an available book.

  2. B

    Enable registered members to reserve available books online.

  3. C

    A working online reservation feature.

  4. D

    The project must use the library’s existing catalog system.

15
Choose one
1 point

Which proposed requirement is clearest and most directly testable?

  1. A

    The service should be pleasant for everyone.

  2. B

    The project should improve the overall library experience.

  3. C

    The system shall let a registered member reserve an available book.

  4. D

    The team will create a reservation feature that users will probably like.

16
True or false
1 point

True or false: Once the scope and requirements are approved as a baseline, the project team must reject every later change.

  1. A

    True

  2. B

    False

17
Choose one
1 point

A team needs to define acceptance criteria for an online reservation feature. Which proposal makes completion observable?

  1. A

    The feature is considered complete when the team has started building it.

  2. B

    A member can reserve an available title, receive confirmation, and see the reservation in their account.

  3. C

    The feature is considered complete when the project team agrees it is useful.

  4. D

    The feature is considered complete when the catalog system has been redesigned.

18
Written response
1 point

A team checks whether a completed service meets the customer’s intended need. What is this activity called?

19
Choose one
1 point

A library project includes online reservations but explicitly excludes redesigning the catalog system. How should the catalog redesign be classified?

  1. A

    Redesigning the library’s catalog system is out of scope.

  2. B

    Redesigning the library’s catalog system is an acceptance criterion for online reservations.

  3. C

    Redesigning the library’s catalog system is an interface between teams.

  4. D

    Redesigning the library’s catalog system is a requirement for reserving an available book.

20
Written response
1 point

What term describes maintaining links between a requirement and the objective or stakeholder need it supports?