01
Choose one
1 point

Which approach best assesses settlement for a foundation?

  1. A

    Estimate only immediate settlement because later movement is unrelated to design.

  2. B

    Use a single average settlement value and disregard how movement varies across the foundation.

  3. C

    Estimate relevant settlement components over the design life and assess both total and differential movement.

02
Choose all
1 point

Select all appropriate practices for assessing settlement.

  1. A

    Account for uncertainty in layer thickness and soil variability.

  2. B

    Treat a prediction as certain once a ground model has been prepared.

  3. C

    Use settlement plates to compare observed movement with predictions.

  4. D

    Consider drainage conditions when evaluating the prediction.

03
True or false
1 point

Uncertainty in drainage conditions and soil variability can substantially affect settlement predictions.

  1. A

    True

  2. B

    False

04
Written response
1 point

What term describes unequal ground movement across a foundation or structure?

05
Fill in the blank
1 point

Primary consolidation settlement occurs as dissipates. Continued deformation after primary consolidation is substantially complete is called .

06
Open ended
1 point

Describe how an engineer should assess total and differential settlement, account for uncertainty in predictions, and use field observations during construction.

07
Choose one
1 point

Which description identifies primary consolidation settlement?

  1. A

    Deformation occurring during or soon after loading.

  2. B

    Compression as excess pore-water pressure dissipates.

  3. C

    Continued deformation after primary consolidation is substantially complete.

08
Choose all
1 point

Select all statements supported about field observations during construction.

  1. A

    Settlement plates can help compare observed movement with predicted movement.

  2. B

    Piezometers can help compare observed pore pressures with predictions.

  3. C

    Field instruments eliminate the need to consider uncertainty in the ground model.

  4. D

    Monitoring results can guide decisions about staged loading or when construction can begin above treated ground.

09
True or false
1 point

Uniform settlement is generally more damaging than differential settlement.

  1. A

    True

  2. B

    False

10
Written response
1 point

What is the standard term for continued deformation after primary consolidation is substantially complete?

11
Fill in the blank
1 point

Settlement estimates may include during or soon after loading, as excess pore-water pressure dissipates, and that can continue after primary consolidation is substantially complete.

12
Choose one
1 point

Which statement correctly describes how field instruments can help compare settlement predictions with observed conditions during construction?

  1. A

    Settlement plates measure pore-water pressure, and piezometers measure ground movement.

  2. B

    Settlement plates track movement, and piezometers monitor pore-water pressure.

  3. C

    Both instruments measure only soil density.

  4. D

    Both instruments are used only to measure the thickness of soil layers.

13
True or false
1 point

Immediate settlement is relevant only in clay soils, not in sands.

  1. A

    True

  2. B

    False

14
Written response
1 point

What is the term for unequal ground movement across a foundation or structure?

15
Choose one
1 point

Why can differential settlement be more damaging than uniform settlement?

  1. A

    Uniform settlement is always more damaging because all parts of a structure move together.

  2. B

    Differential settlement is harmless if total settlement is small.

  3. C

    Differential settlement can be more damaging because unequal movement can distort structures and disrupt utilities.

  4. D

    Differential settlement matters only for road surfaces.

16
True or false
1 point

Settlement design should consider both the expected magnitude of movement and how it is distributed over distance and time.

  1. A

    True

  2. B

    False

17
Written response
1 point

Which instrument is used to monitor pore-water pressure during construction? Enter its singular name.

18
Choose one
1 point

Which group of factors can substantially increase uncertainty in settlement predictions?

  1. A

    Uncertainty in layer thickness, stress history, drainage conditions, and soil variability.

  2. B

    The color of construction equipment and the time of day.

  3. C

    The number of road lanes and the shape of nearby buildings.

  4. D

    Only the dimensions of the completed structure.

19
Written response
1 point

What is the continued deformation after primary consolidation is substantially complete called? Enter the term or its established synonym.

20
Choose one
1 point

How is total settlement assessed over a project's design life?

  1. A

    It is the largest single settlement component, regardless of the others.

  2. B

    It is the sum of the relevant settlement components evaluated over the project’s design life.

  3. C

    It includes only secondary compression.

  4. D

    It is the difference between immediate settlement and primary consolidation settlement.